Santa Clarita Valley Water Agency Awards LEE + RO with Two Projects
Jan 19, 2023
Planning and Preliminary Design Improvements for the New Catala Pump Station and Pipelines
Planning and Preliminary Design Improvements for the New Catala Pump Station and Pipelines
Design an interconnection to provide system reliability and redundancy within the Canyon Lake area
The City of Riverside Regional Water Quality Control Plant (RWQCP) has five (5) influent sewers.
District to retire the existing Broadway Sewer Pump Station
Speed is essential to meet Caltrans' permitting requirements
The City of Anaheim’s (City) Department of Public Utilities has contracted LEE + RO to design the replacement of their existing 16-inch diameter potable water mainline with a new 24-inch diameter potable water mainline.