News Banner iStock-897958450 Compressed

News

Explore. Learn. Engage.

Subscribe for updates

OC SAN Contracts LEE + RO for Design Services to Replace the Sodium Bisulfite Station and Anionic Polymer Station at Plant No. 2

Apr 26, 2023

Services Include Demolition, Design, Structural Rehabilitation, and New Electrical Upgrades

East Bay Municipal Utility District Contracts LEE + RO to Conduct Multiple Condition Assessments, Evaluations, and Designs

Feb 14, 2023

Projects Elements include Grit Dewatering Building Equipment Replacement; Reactor Drain, Gallery Drain, and Washdown Water (3W) Improvements; and Wet Weather Storage Basin Rehabilitation

City of San Clemente Awards LEE + RO Contract to Provide Engineering Services

Feb 1, 2023

Design the Replacement of Sluice Gates in the WRP Splitter Box

LEE + RO Partners with Gate 5 Energy Partners on New System that Transforms Biosolids into 100% safe and usable resources

Oct 19, 2021

LEE + RO is providing Gate 5 Energy Partners, Inc. (Gate 5) with design services for construction documents and supporting material to complete a demonstration scale of their MG5 System at Santa Margarita Water District’s Chiquita Water Reclamation Plant.

LEE + RO to Provide Engineering Design Services for the City of Brawley to Replace Two Raw Water Storage Reservoir Liners

Oct 19, 2021

The City of Brawley (City) owns and operates a 15 MGD capacity water treatment plant and distribution system that includes two raw water storage reservoirs and two spent backwash water storage reservoirs. The reservoirs are concrete with polypropylene liners.

LEE + RO will be a subconsultant to Fraxia Engineering on a install a chloramination system for the San Jose Water Company.

Jul 13, 2021

Fraxia Engineering (Fraxia), a San Jose-based firm, won the contract from the San Jose Water Company (SJWC) to install a chloramination system inside a new block building at their 12th Street Station facility. SJWC has installed this type of system on other facilities.