OC SAN Contracts LEE + RO for Design Services to Replace the Sodium Bisulfite Station and Anionic Polymer Station at Plant No. 2
Apr 26, 2023
Services Include Demolition, Design, Structural Rehabilitation, and New Electrical Upgrades
Services Include Demolition, Design, Structural Rehabilitation, and New Electrical Upgrades
Projects Elements include Grit Dewatering Building Equipment Replacement; Reactor Drain, Gallery Drain, and Washdown Water (3W) Improvements; and Wet Weather Storage Basin Rehabilitation
Design the Replacement of Sluice Gates in the WRP Splitter Box
LEE + RO is providing Gate 5 Energy Partners, Inc. (Gate 5) with design services for construction documents and supporting material to complete a demonstration scale of their MG5 System at Santa Margarita Water District’s Chiquita Water Reclamation Plant.
The City of Brawley (City) owns and operates a 15 MGD capacity water treatment plant and distribution system that includes two raw water storage reservoirs and two spent backwash water storage reservoirs. The reservoirs are concrete with polypropylene liners.
Fraxia Engineering (Fraxia), a San Jose-based firm, won the contract from the San Jose Water Company (SJWC) to install a chloramination system inside a new block building at their 12th Street Station facility. SJWC has installed this type of system on other facilities.