LEE + RO to Provide Engineering Design Services for the City of Brawley to Replace Two Raw Water Storage Reservoir Liners
Oct 19, 2021
The City of Brawley (City) owns and operates a 15 MGD capacity water treatment plant and distribution system that includes two raw water storage reservoirs and two spent backwash water storage reservoirs. The reservoirs are concrete with polypropylene liners.