---
title: SCV Water Contracts LEE + RO to Design Pipelines for Sierra Highway Bridge
description: The City of Santa Clarita is currently designing their Sierra Highway Bridge Widening project. As part of construction of that project, the southbound bridge will be reconstructed.
image: https://www.lee-ro.com/hubfs/Santa%20Clarita%20Valley%20Water%20Agency.jpg
---

- [News](https://www.lee-ro.com/news)
- [Archive](https://www.lee-ro.com/news/archive)
- [Clients](https://www.lee-ro.com/clients)
- [Memoriam](https://www.lee-ro.com/memoriam)
- [COVID-19](https://www.lee-ro.com/covid-statement)

[![LEE RO Logo color NEW 150](https://www.lee-ro.com/hs-fs/hubfs/LR%20Global%20Header/LEE%20RO%20Logo%20color%20NEW%20150.png?width=406&height=158&name=LEE%20RO%20Logo%20color%20NEW%20150.png) ![LEE RO Logo color NEW 150](https://www.lee-ro.com/hs-fs/hubfs/LR%20Global%20Header/LEE%20RO%20Logo%20color%20NEW%20150.png?width=406&height=158&name=LEE%20RO%20Logo%20color%20NEW%20150.png)](https://www.lee-ro.com/lr-homepage)

- Careers 
    - [Why LEE + RO](https://www.lee-ro.com/careers/why-lee-ro)
    - [Openings](https://www.lee-ro.com/openings)
- What We Do 
    - [Wastewater Treatment](https://www.lee-ro.com/services/wastewater-treatment)
    - [Wastewater Conveyance](https://www.lee-ro.com/services-wastewater-conveyance)
    - [Water Treatment](https://www.lee-ro.com/services-water-treatment)
    - [Water Conveyance](https://www.lee-ro.com/services-water-conveyance)
    - [Design-Build](https://www.lee-ro.com/services/design-build)
    - [Recycled Water](https://www.lee-ro.com/services-recycled-water)
    - [Electrical and I&C](https://www.lee-ro.com/services-electrical)
    - [Condition Assessment](https://www.lee-ro.com/services-condition-assessment)
    - [Construction Management](https://www.lee-ro.com/services-construction-management)
- [Solutions](https://www.lee-ro.com/solutions)
- [Projects](https://www.lee-ro.com/projects)
- Who we are 
    - [Vision + Mission + Values](https://www.lee-ro.com/about/vision-mission-values)
    - [Founders](https://www.lee-ro.com/about/the-founders)
    - [Our Story](https://www.lee-ro.com/about/our-story)
    - [Leadership](https://www.lee-ro.com/about/leadership)
    - [Sustainability](https://www.lee-ro.com/about/sustainability)
    - [News Archive](https://www.lee-ro.com/news/archive)
- [Contact](https://www.lee-ro.com/contact)

###### 1 min read

# [SCV Water Contracts LEE + RO to Design Pipelines for Sierra Highway Bridge](https://www.lee-ro.com/news/scv-water-contracts-lee-ro-to-design-pipelines-for-sierra-highway-bridge)

 Apr 6, 2023 8:37:00 AM

**LEE + RO to address constraints, anticipated problems, and potential construction issues.**

The City of Santa Clarita is currently designing their Sierra Highway Bridge Widening project. As part of construction of that project, the southbound bridge will be reconstructed. The Santa Clarita Valley Water Agency (Client) is constructing two new pipelines (one 20” potable water pipe and one 20” recycled water pipe) inside two new bridge cells. Each bridge cell will contain one new pipeline.

1. The **potable water** pipe-line work will include a pipeline casing, spacers, the carrier pipeline, pipeline supports and appurtenances, as-needed vaults, and the connections to the existing pipelines on the North and South sides of the bridge.
2. The **recycled water** pipeline work will include a pipeline casing, spacers, the carrier pipeline, pipeline supports and appurtenances, as-needed vaults, and capped-out stub outs for future connections.

**Situation**

Water pipelines are one of the “high-risk” utilities by many bridge agencies since its failure could damage the structure, endanger the public or create a traffic hazard. The advantage of using a host bridge in an established corridor over building a dedicated crossing provides greater pipe alignment, lower pipeline cost, reduced environmental impact, and simplified and faster permitting process.

The Project execution will be completed over three months and services includes:

- Project Management and Meetings
- Preliminary Design Investigation
- 75% Plans, Specs, And Estimates
- 100% Plans, Specs, And Estimates
- Bid Documents

###### Topics: [2023](https://www.lee-ro.com/news/topic/2023) [Recycled Water](https://www.lee-ro.com/news/topic/recycled-water) [Water Conveyance](https://www.lee-ro.com/news/topic/water-conveyance) [Pipeline Water](https://www.lee-ro.com/news/topic/pipeline-water) [Pipeline Recycled Water](https://www.lee-ro.com/news/topic/pipeline-recycled-water)

![Murthy Kadiyala, PE](https://via.placeholder.com/100x100.jpg/e0e7ee)

#### Written by [Murthy Kadiyala, PE](https://www.lee-ro.com/news/author/murthy-kadiyala)

###### [Previous Post](https://www.lee-ro.com/news/city-of-colton-to-design-a-new-sewer-lift-station)

[![](https://via.placeholder.com/300x150.jpg/e0e7ee)](https://www.lee-ro.com/news/city-of-colton-to-design-a-new-sewer-lift-station)

###### [City of Colton Contracts LEE + RO to Design a New Sewer Lift Station](https://www.lee-ro.com/news/city-of-colton-to-design-a-new-sewer-lift-station)

###### [Next Post](https://www.lee-ro.com/news/oc-san-design-services-to-replace-stations)

[![](https://via.placeholder.com/300x150.jpg/e0e7ee)](https://www.lee-ro.com/news/oc-san-design-services-to-replace-stations)

###### [OC SAN Contracts LEE + RO for Design Services to Replace the Sodium Bisulfite Station and Anionic Polymer Station at Plant No. 2](https://www.lee-ro.com/news/oc-san-design-services-to-replace-stations)

[All posts](https://www.lee-ro.com/news/all)

### Related News

### News by Tag

- [2021 (25)](https://www.lee-ro.com/news/tag/2021)
- [2022 (9)](https://www.lee-ro.com/news/tag/2022)
- [2023 (25)](https://www.lee-ro.com/news/tag/2023)
- [2024 (8)](https://www.lee-ro.com/news/tag/2024)
- [Advanced Water Treatment (1)](https://www.lee-ro.com/news/tag/advanced-water-treatment)
- [Civil (7)](https://www.lee-ro.com/news/tag/civil)
- [Condition Assessment (13)](https://www.lee-ro.com/news/tag/condition-assessment)
- [Construction Management (4)](https://www.lee-ro.com/news/tag/construction-management)
- [Disinfection/Chemical Handling, Storage, Feeding (7)](https://www.lee-ro.com/news/tag/disinfection-chemical-handling-storage-feeding)
- [Electrical (31)](https://www.lee-ro.com/news/tag/electrical)
- [Employees (9)](https://www.lee-ro.com/news/tag/employees)
- [Flow/Pressure Control Facility (3)](https://www.lee-ro.com/news/tag/flow-pressure-control-facility)
- [Inspection Services (2)](https://www.lee-ro.com/news/tag/inspection-services)
- [Instrumentation and Control (18)](https://www.lee-ro.com/news/tag/instrumentation-and-control)
- [Lift Station (2)](https://www.lee-ro.com/news/tag/lift-station)
- [Lift Station Wastewater (4)](https://www.lee-ro.com/news/tag/lift-station-wastewater)
- [Mechanical (7)](https://www.lee-ro.com/news/tag/mechanical)
- [Membrane (MBR/RO) (1)](https://www.lee-ro.com/news/tag/membrane-mbr-ro)
- [Pipeline (1)](https://www.lee-ro.com/news/tag/pipeline)
- [Pipeline Collections (5)](https://www.lee-ro.com/news/tag/pipeline-collections)
- [Pipeline Force Mains (4)](https://www.lee-ro.com/news/tag/pipeline-force-mains)
- [Pipeline Recycled Water (1)](https://www.lee-ro.com/news/tag/pipeline-recycled-water)
- [Pipeline Water (3)](https://www.lee-ro.com/news/tag/pipeline-water)
- [Power Distribution (6)](https://www.lee-ro.com/news/tag/power-distribution)
- [Pump Station (4)](https://www.lee-ro.com/news/tag/pump-station)
- [Pump Station Water (4)](https://www.lee-ro.com/news/tag/pump-station-water)
- [Recycled Water (6)](https://www.lee-ro.com/news/tag/recycled-water)
- [Recycled Water Storage (1)](https://www.lee-ro.com/news/tag/recycled-water-storage)
- [Storm Water (1)](https://www.lee-ro.com/news/tag/storm-water)
- [Structural (12)](https://www.lee-ro.com/news/tag/structural)
- [Tanks/Reservoirs Water (3)](https://www.lee-ro.com/news/tag/tanks-reservoirs-water)
- [Wastewater Conveyance (6)](https://www.lee-ro.com/news/tag/wastewater-conveyance)
- [Wastewater Treatment (6)](https://www.lee-ro.com/news/tag/wastewater-treatment)
- [Wastewater Treatment Facilities (3)](https://www.lee-ro.com/news/tag/wastewater-treatment-facilities)
- [Water Conveyance (9)](https://www.lee-ro.com/news/tag/water-conveyance)
- [Water Storage (1)](https://www.lee-ro.com/news/tag/water-storage)
- [Water Treatment (2)](https://www.lee-ro.com/news/tag/water-treatment)
- [Water Treatment Facilities (3)](https://www.lee-ro.com/news/tag/water-treatment-facilities)
- [Water Well/Wellhead Facility (1)](https://www.lee-ro.com/news/tag/water-well-wellhead-facility)

**Los Angeles (HQ)**  
[626-912-3391](tel:6269123391)

**Bay Area**  
[925-937-4050](tel:9259374050)

**San Diego**  
[858-558-4411](tel:8585584411)

- [Privacy Policy](https://www.lee-ro.com/privacy-policy)

© 2000 - 2025 LEE & RO, Inc.