Goleta Water District (GWD) has seven different facilities equipped with stationary diesel-fueled emergency power generators ranging in size from 16 kW up to 750 kW. GWD issued a task order to LEE + RO to evaluate and perform a condition assessment on these generators and provide prioritized recommendations for repairs or replacement to avert potential future failures.
The scope of work includes:
- Site visits to gather information on the existing generators and installed conditions. Based on the gathered information, the initial assessment will consider:
- Failure History and Causes
- Aging (number of years the generator has been in-service)
- Annual Maintenance Routines
- Parts and Service Availability
- Current Loading
- Planned Future Loading
- Present the initial assessment to discuss the findings and determine the direction forward for each of the seven generators.
- Final Assessment Report. This report will include an assessment for each of the existing generators, repair or replacement recommendations, prioritization of the work, and associated preliminary cost estimates.