Santa Margarita Water District Contracts LEE + RO for Engineering Design and Construction Support Services
Aug 26, 2024
Services include chemical storage and metering systems for Reservoir Management Systems at four sites
Services include chemical storage and metering systems for Reservoir Management Systems at four sites
Chloramine Booster Systems for Reservoirs 1A, 1B, 4, and 5
Services Include Demolition, Design, Structural Rehabilitation, and New Electrical Upgrades
The City of Brawley (City) owns and operates a 15 MGD capacity water treatment plant and distribution system that includes two raw water storage reservoirs and two spent backwash water storage reservoirs. The reservoirs are concrete with polypropylene liners.
The City of Brawley (City) owns and operates a wastewater treatment plant with a 5.9 million gallons per day permitted capacity. The influent wastewater is treated by extended aeration basins (i.e., Biolac system) and secondary clarifiers. The secondary effluent is then disinfected by a Trojan UV4000 system and then discharged to the New River.
LEE + RO has completed several projects for the City of Colton, including their Wastewater Treatment Plant Centrifuge project, Plant 2 Condition Assessment, and the Prado Booster Pump Station Upgrades (currently under construction).
The City of El Centro (City) owns and operates a Water Treatment Plant (WTP) that receives its water supply from the Colorado River through the Imperial Irrigation District’s (IID) canals. The City’s WTP has a design capacity of 21 MGD, with an average daily demand of 7.8 MGD and current peak flows of 13-14 MGD.