MWD Contracts LEE + RO to Conduct Preliminary Design Services
Oct 17, 2022
Replacement of Two Radial Gates Along the San Diego Canal
Replacement of Two Radial Gates Along the San Diego Canal
The Sewer Maintenance Division (SMD) of the County of Los Angeles Department of Public Works has awarded LEE + RO with a contract to provide design engineering services for the preparation of two separate but concurrent Preliminary Design Reports (PDR) for the replacement of the Fountain Springs and Indian Creek Pump Stations, both located within the City of Diamond Bar.