At that time, GWD was expecting to relocate the entire BPS due to a conflicting City of Goleta Road Improvement Project. However, the City postponed their project and GWD is interested in replacing the electrical gear as recommended in the original Arc Flash report to eliminate as many worker safety hazards as possible.
Because the District anticipates having to eventually relocate the BPS, this task order project provides a preliminary design for the electrical gear replacement and an evaluation for its potential relocation and reuse at the new BPS future location.