The PDRs will evaluate optimal solutions for the replacement of the two pump stations and will serve as the basis of design for all elements in the final design of the project. The evaluation will focus on the ease of constructability, process benefits, and overall project quality along with construction, lifecycle, operation, and maintenance costs.
Project elements for the two pump stations include the construction of new pump stations including all civil, architectural, landscaping, structural, mechanical, electrical, and I&C engineering.
The existing pump stations will be demolished after the new pump stations are constructed and are placed into service.