The East Bay Municipal Utility District (District) has contracted LEE + RO to perform engineering evaluations and make design recommendations for improvements at the District’s Main Wastewater Treatment Plant in Oakland, California.
LEE + RO will work as part of a District-led design team, providing civil/wastewater process, mechanical, and structural engineering to produce construction bid documents, provide support during bidding, and provide engineering services during construction. Drafting for all construction bid documents will be performed by District staff. The improvements include equipment replacement in the Grit Dewatering Building, Reactor Drain, Gallery Drain, and Washdown Water (3W) improvements, and Wet Weather Storage Basin (WWSB) rehabilitation. These projects will be packaged into two construction contracts for bidding, SD-432 and SD-439.
Much of this equipment and the structures have aged including some beyond their useful life. Capacity of certain systems such as the 3W system will also be increased as necessary to meet the current level of services.
The main goals of this Project are to restore and/or improve treatment reliability, functionality, and conditions for personnel safety.
LEE + RO’s pre-design scope of services include conducting field studies, performing tests, performing calculations, running models, and preparing technical memorandums (TMs) for the Grit Discharge Line condition assessment, 3W Pipe condition assessment, Reactor Drain hydraulic evaluation, and 3W distribution system hydraulic evaluation. A 10% design will include defining project design criteria and will serve as the basis of design. Detailed design submittals include submittals at 50%, 90%, and Final. LEE + RO is providing Independent Peer Reviews (IPRs) of all TMs and design submittals. The Peer Reviewer will perform their reviews independent from LEE + RO’s design and QA/QC efforts and will coordinate all IPR findings and resolutions directly with the District’s Project Manager.
SD-432 projects include the following:
Grit Dewatering Building Equipment Replacement
Reactor Drain Improvements
SD-439 projects include the following:
Washdown Water (3W) System Improvements
Wet Weather Storage Basin (WWSB) Concrete Rehabilitation
Gallery and Vault Drain Improvements
Design schedule for SD-432 is approximately 9 months. Design for SD-439 will commence after SD-432 goes to bid with a design schedule of approximately 11 months.