• News
  • Archive
  • Clients
  • COVID-19
LEE RO Logo color NEW 150
LEE RO Logo color NEW 150
  • Careers
    • Why LEE + RO
    • Openings
  • What We Do
    • Wastewater Treatment
    • Wastewater Conveyance
    • Water Treatment
    • Water Conveyance
    • Design-Build
    • Recycled Water
    • Electrical and I&C
    • Condition Assessment
    • Construction Management
  • Solutions
  • Projects
  • Who we are
    • Vision + Mission + Values
    • Founders
    • Our Story
    • Leadership
    • Sustainability
    • News Archive
  • Contact
Eric Lovering, PE

Eric Lovering, PE


Recent posts by Eric Lovering, PE

LEE + RO to Provide Kennedy Jenks with PDR Services for the MWD/EMWD Pump Station Project

Dec 21, 2023

Diamond Valley Lake SOW includes mechanical, electrical, and I&C support.

LEE + RO to Provide Electrical Design Services for the City of LA’s Tillman Advanced Water Purification Facility

Mar 6, 2023

Plant to Produce Purified Water Suitable for Groundwater Replenishment

All posts

Recent News

News by Tag

  • 2021 (25)
  • 2022 (9)
  • 2023 (25)
  • 2024 (8)
  • Advanced Water Treatment (1)
  • Civil (7)
  • Condition Assessment (13)
  • Construction Management (4)
  • Disinfection/Chemical Handling, Storage, Feeding (7)
  • Electrical (31)
  • Employees (9)
  • Flow/Pressure Control Facility (3)
  • Inspection Services (2)
  • Instrumentation and Control (18)
  • Lift Station (2)
  • Lift Station Wastewater (4)
  • Mechanical (7)
  • Membrane (MBR/RO) (1)
  • Pipeline (1)
  • Pipeline Collections (5)
  • Pipeline Force Mains (4)
  • Pipeline Recycled Water (1)
  • Pipeline Water (3)
  • Power Distribution (6)
  • Pump Station (4)
  • Pump Station Water (4)
  • Recycled Water (6)
  • Recycled Water Storage (1)
  • Storm Water (1)
  • Structural (12)
  • Tanks/Reservoirs Water (3)
  • Wastewater Conveyance (6)
  • Wastewater Treatment (6)
  • Wastewater Treatment Facilities (3)
  • Water Conveyance (9)
  • Water Storage (1)
  • Water Treatment (2)
  • Water Treatment Facilities (3)
  • Water Well/Wellhead Facility (1)

Los Angeles (HQ)
626-912-3391

Bay Area
925-937-4050

San Diego
858-558-4411

  • Privacy Policy

© 2000 - 2025 LEE & RO, Inc.