LEE & RO provided engineering, design, and construction phase engineering services for a $1.5 million project, converting gaseous chlorine to liquid sodium hypochlorite disinfection at the 5 mgd water treatment plant.  The new hypochlorite facilities, including two 2,000 gallon storage tanks, five metering pumps, feed piping, and electrical and control systems, were installed including upgrades to safety features such as ventilation, eye washing, and lighting.  Work also included programming and integration to the existing SCADA system and miscellaneous structural and piping modifications. 

1/11

Bowman Water Treatment Plant

Sodium Hypochlorite Disinfection Conversion Project
Placer County Water Agency

Auburn, CA