| :: Construction Management / Resident Engineering (CM/RE), and Program Management | ||||||
CM/RE
Services, Wastewater Treatment Plant Upgrading, City of Brawley, CALEE & RO, Inc. was retained by the City of |
||||||
CM/RE
Services, Wastewater Treatment Plant Expansion, Valley Sanitary District,
Indio, CA
As Prime Consultant LEE & RO provided the construction management and resident engineering services for a $24 million plant expansion project that will increase the activated sludge plant capacity from 5 mgd to 10 mgd. Project components include retrofit of existing aeration tanks, new Turblex aeration blowers, secondary clarifiers, chlorine contact tanks, a 54-inch outfall, and sludge dewatering belt presses. The construction and commissioning was completed in June 2009. |
||||||
Project
Management and Peak Support Services, Capital Improvement Program, San
Diego COunty Water Authority As the Principal Subconsultant (25% share of contract value) to Jacobs Engineering, LEE & RO provided program management and engineering support services from January 2006 to March 2009. This assignment provided assistance to the Authority with water system master planning, design management, and construction management for a $3 billion capital program that will include new water treatment plants, reservoirs and conveyance systems. |
||||||
CM/RE
Services, Water Reclamation Plant No. 4 Expansion, Coachella Valley Water
District, COachella, CA
As Prime Consultant, LEE & RO provided full engineering services for two separate projects at Water Reclamation Plant No. 4, the $18 million Phase 4 Plant Expansion project increasing treatment capacity from 6.9 mgd to 9.9 mgd, and the $4 million Chlorination & Dechlorination (C&D) project for the expanded 9.9 mgd capacity. The $4 million C&D project construction was completed in 2007 and the $18 million Phase 4 Plant Expansion project construction and commissioning were completed in August 2008. |
||||||
CM/RE
Services, Zone 6A and Zone B+ Booster Pump STation (BPS) Improvements,
Irvine Ranch Water District, Irvine, CA
As Prime Consultant, LEE & RO was responsible for construction management and resident engineering for two pump station improvement projects, the Zone 6A high pressure BPS and Zone B+ BPS in the Turtle Rock area of |
||||||
Resident
Inspection Services for Anza and Imperial Ave. Lateral Project, West Basin
Municipal Water District and U. S. Army Corps of EngineersLEE & RO is providing resident inspection services to the West Basin Municipal Water District and the U.S. Army Corps of Engineers-Los Angeles District for the construction of the Anza Avenue Lateral (14,500 feet of 8 inch) and Imperial Avenue Lateral (8,000 feet of 6 inch). LEE & RO is also providing project supervision, community outreach, quality assurance, and coordination of construction testing, start-up, and project close-out services. These laterals will provide recycled water to parks and schools for landscape irrigation within the City of |
||||||
CM/RE
Services, Olsen Road Wastewater Pumping Station, Sewer and Force Main,
City of THousand Oaks, CA
As Prime Consultant, LEE & RO provided construction management and resident engineering services for a $3.5 million project for diversion of wastewater flow from the Olsen Road Wastewater Treatment Plant to the City’s main plant, the Hill Canyon Wastewater Treatment Plant, via the City’s trunk sewer system. The project included a high-head lift station, 7,000 feet of 12-inch diameter gravity sewer and 7,000 feet of 8-inch diameter force main. The project also included cured-in-place pipe (CIPP) rehabilitation of sewers. |
||||||
CM/RE
Services, Reclamation Plant Expansion and Biosolids Thickening and
Dewatering Facilities, Water Reclamation Plant No. 10, Coachella Valley
Water District, Coachella, CA
As Prime Consultant LEE & RO is providing resident engineering/construction management services for two major capital improvement projects at Water Reclamation Plant No. 10, a new $11 million 5 mgd Title 22 tertiary treatment plant (filtration and chlorination), and an $18 million biosolids handling facility, with DAF thickeners, belt presses, odor control system, and a truck loading system for an 18 mgd water recycling plant. The tertiary plant construction was completed in 2002 and the biosolids facility construction was completed in May 2008. |
||||||
Program
Management Services, Water Resources Capital Improvement Program, City of
Arcadia, CA As Prime Consultant, LEE & RO provided program management services for several major capital improvement projects funded by the United States Environmental Protection Agency. Services included preparing RFPs, reviewing proposals, and overseeing agreements, invoices, and the work progress of design and construction management consultants. Work also involved technical and constructability reviews and resolution of construction issues. Projects included seismic rehabilitation of the 3.2 million gallon capacity Santa Anita Reservoir No. 3, Chapman Well No. 7 rehabilitation and equipping/booster pumping, sodium hypochlorite disinfection systems, and 4,000 gpm Camino Real Booster Pump Station. |
||||||
CM/RE
Services, Wastewater Treatment Plant Phase 1 and Phase 2 Expansion /
Improvement Projects, City of Patterson, CA
As Prime Consultant, LEE & RO provided construction management and resident engineering services for two consecutive expansion projects. The $6 million Phase 1 Expansion/Improvement project increased capacity from 0.5 mgd to 1.3 mgd in 2003 and the $10 million Phase 2 Plant Expansion/Improvement project increased capacity from 1.3 mgd to 2.0 mgd in 2007. Project components included headworks, oxidation ditch, activated sludge, and percolation ponds. |
||||||
CM/RE
Services, Wastewater Treatment Plant Improvement Projects, Encina Water
Pollution COntrol Facility, Carlsbad, CA
As Prime Consultant, LEE & RO provided construction management and resident engineering services for two treatment plant improvement projects for the 38 mgd EWPCF, the Chemical Enhanced Primary Treatment (CEPT) project and a secondary treatment capacity improvements project including aeration tank retrofits and fine bubble diffuser installation. The CEPT consisted of ferric chloride and polymer storage, mixing and pumping/ injection facilities designed to improve the BOD and suspended solids removal efficiency. The secondary improvements project consisted of the installation and modification of aeration piping, aeration headers and blower/DO controls, and the installation of fine bubble diffusers in the fourth aeration basin. |
||||||
CM/RE
Services, Recycled Water Conversion Projects, Long Beach Water Department
As Prime Consultant, LEE & RO provided construction management and inspection services for a conversion project involving the disconnection of existing potable water supplies from park irrigation systems and providing new recycled water connections, meters, and related piping. The project included a 6,100 feet long, 6-inch ductile iron pipeline below a very congested |
||||||
CM/RE
Services, Joint Regional Treatment Plant Aeration System Upgrade, South
Orange County Wastewater Authority (SOCWA), Dana Point, CA As Prime Consultant, LEE & RO provided construction management and resident engineering services for a $4 million aeration system upgrade at the 12 mgd Joint Regional Treatment Plant in Laguna Niguel owned by the Moulton Niguel Water District. The project included a new blower building, installation of a new single stage Turblex brand 450 hp and 8,000 cfm blower and two new multi-stage Hoffman brand 300 hp and 4,400 cfm blowers, replacement and modification of aeration air piping, demolition of existing aeration equipment, installation of new Parkson fine bubble aeration panels in the existing aeration tanks, and associated site, electrical, and instrumentation system improvements. |
||||||